Fire Safety Statement - cladding of Reception and Year 1 Block

Given the recent tragic event at Grenfell Tower and subsequent concerns regarding cladding, we have contacted the suppliers of the cladding recently installed on the part of our building housing Reception and Year 1 - the old CLASP building.

 

We have been assured that the product used - Permarock Mineral Fibre System - meets all the necessary regulations. Further details are below:

 

The PermaRock system employed on this project to which you refer was a PermaRock Mineral Fibre System. This system comprises adhesively bonded and mechanically fixed PermaRock Mineral Fibre insulation which is non-combustible (Euroclass A1 to BS EN ISO 13501-1:2007 +A1:2009). The insulation is adhesively bonded to the wall (to ensure that there is no continuous cavity to contribute to a chimney effect behind the insulation) as well as being mechanically fixed. The render system comprises of a reinforced basecoat (which is a cement-based material into which a glass fibre reinforcing mesh is incorporated during installation) with a decorative finish, or finishes, applied over. The entire render system is applied directly onto the insulation, with no cavity through which a fire could spread.

Welcome to Parkdale Primary School, Summer Term 2018-19....

Attendance

Current Term:

  • Academic Year 2018-2019 (to Easter) - 97.0%
  • Top Class - 4 Bonsai 97.8% - 2nd - 2 Sycamore 97.7%
  • 3rd - 5 Maple 97.6% -

Previous Term:

  • -
  • -
  • -

Overall: 2017-18 = 96.8%, 2018-19 to date 97%

Contact Us

We've had 8 8 4 3 7 visitors

House Points

  • Newstead 3313
  • Clumber 4404
  • Wollaton 4368
  • Rufford 3821
Top